Posted on
October 06, 2010 by
bp complaints
|
Deepwater Horizon: DNV to examine BOP, riser package from Macondo PennEnergy- Energy News (press release) HOUSTON – The US Interior and Homeland Security Joint Investigation Team (JIT) has contracted DNV to conduct a forensic examination of the BOP and lower …
and more »
|
deepwater horizon – Google News
Tags: DeepwaterEnergyexamineHorizonMacondoNewsPackagePennEnergypressRELEASERiser
Category
News
Posted on
June 02, 2010 by
bp complaints
HOUSTON – BP prepares for the Lower Marine Riser Package Cap (LMRP) installation, a method that may help contain the flow of oil from the well until the permanent relief well is drilled. This video illustrates the the removal of a section of the riser. Video courtesy of BP.
Uploads by deepwaterhorizonjic
Tags: ExplainedinstallationLMRPlowermarinePackagePreparesRiser
Category
News
Posted on
June 02, 2010 by
bp complaints
HOUSTON – BP prepares for the Lower Marine Riser Package Cap (LMRP) installation, a method that may help contain the flow of oil from the well until the permanent relief well is drilled. This video illustrates the diamond bladed cutter being moved into position to make the second critical cut. Video courtesy of BP.
Uploads by deepwaterhorizonjic
Tags: installationLMRPlowermarinePackagePreparesRiser
Category
News
Posted on
June 02, 2010 by
bp complaints
*Link opens in bp.com site.* Kent Wells, BP’s Senior Vice President, exploration and production, provides a technical update on what is happening to contain the flow of oil from the well. He reviews a multi-step containment strategy that includes the Lower Marine Riser Package Cap and other steps to increase the overall efficiency of the containment operation.
Recent Updates for Deepwater Horizon Response
Tags: briefinglowermarinePackageRiserTechnicalUPDATE
Category
News