Riser cut explained – BP prepares for the Lower Marine Riser Package Cap (LMRP) installation
Posted on
June 02, 2010 by
bp complaints
HOUSTON – BP prepares for the Lower Marine Riser Package Cap (LMRP) installation, a method that may help contain the flow of oil from the well until the permanent relief well is drilled. This video illustrates the the removal of a section of the riser. Video courtesy of BP.
Uploads by deepwaterhorizonjic