BP response – creating a subsea staging area
Posted on
June 02, 2010 by
bp complaints
HOUSTON – BP prepares for the Lower Marine Riser Package Cap (LMRP) installation, a method that may help contain the flow of oil from the well until the permanent relief well is drilled. This video shows the prebuilt mattresses consisting of concrete blocks wired together. Video courtesy of BP.
Uploads by deepwaterhorizonjic