BP prepares for the Lower Marine Riser Package Cap (LMRP) installation
Posted on
June 02, 2010 by
bp complaints
HOUSTON – BP prepares for the Lower Marine Riser Package Cap (LMRP) installation, a method that may help contain the flow of oil from the well until the permanent relief well is drilled. This video illustrates the diamond bladed cutter being moved into position to make the second critical cut. Video courtesy of BP.
Uploads by deepwaterhorizonjic